Europe crossed a symbolic threshold in 2025: cumulative installed battery energy storage capacity p...
READ MORE


A modular high‑voltage LFP battery platform aimed at small‑scale commercial and industrial storage deployments where scalability and system voltage matter. BOS‑G is designed as a series stack (3–12 modules) to create a high‑voltage battery bank suitable for high‑power hybrid/PCS solutions.
Why it’s a practical “go‑to” HV battery choice:
• Modular sizing: start at ~15 kWh (3 modules) and expand to ~61 kWh (12 modules) without changing the technology platform.
• High‑voltage architecture reduces current at the same power level, helping lower cable losses and simplifying large system wiring.
• LFP chemistry targets safety and long cycle life; recommended 90% DoD and ≥6000 cycles supports heavy daily cycling.
• CAN/RS485 communication makes integration with inverters/PCS and EMS straightforward.
Common use cases: small C&I peak‑shaving, microgrids, backup for business‑critical loads, and PV‑plus‑storage retrofits that need higher DC bus voltage than 48V solutions.
| Item | Specification |
| Chemistry | LiFePO₄ (LFP) |
| Single Module | 5.12 kWh, 51.2 V, 100 Ah |
| System Configuration | 3–12 modules in series (nominal voltage 153.6–614.4 V) |
| System Energy | 15.36–61.44 kWh |
| Usable Energy | Up to 55.29 kWh |
| Rated DC Power | Up to 61.44 kW |
| Cycle Life | ≥6000 cycles (EOL70%, 25±2°C, 0.5C/0.5C) |
| Recommended DoD | 90% |
| Operating Temperature – Charge | 0–55°C |
| Operating Temperature – Discharge | -20–55°C |
| Storage Temperature | 0–35°C |
| Communication | CAN 2.0 / RS485 |
| Ingress Protection | IP20 |
Recommend suitable products and configuration plans based on customers' power demand, application scenarios and budget.

Provide system-level combination suggestions for inverters, energy storage, batteries and supporting products.

All products undergo factory inspection and necessary testing before shipment.

Recommend suitable products and configuration plans based on customers' power demand, application scenarios and budget.

Offer product and system operation training for installers and project parties.
Europe crossed a symbolic threshold in 2025: cumulative installed battery energy storage capacity p...
READ MOREA commercial building in Frankfurt swaps its curtain-wall cladding for photovoltaic glass. A homeow...
READ MOREA residential roof in Porto has twelve panels. Three of them sit behind the chimney during the late...
READ MOREWhy the Inverter Decides Whether Your Off-Grid System Actually Works Grid extension quotes for a re...
READ MOREWhy the Skepticism Around Deye On-Grid Inverters? A project engineer recently asked, “Why do I see ...
READ MORE