The Jump From One Cabinet to a Site-Wide Storage Plant A single MC-L430-2H3 cabinet delivers 430.08...
READ MORE

The Deye SUN-6K-G04 is a single-phase grid-tied string inverter for larger single-phase rooftop PV systems. It focuses on efficient DC-to-AC conversion, flexible string design and simple monitoring rather than battery storage.
Installer-facing strengths:
Low start-up voltage helps the system begin producing earlier in the day.
Wide MPPT operating range gives more tolerance for module temperature changes and string layout.
Zero-export and VSG functions support sites where utility export is limited or grid-support settings are required.
IP65 protection and natural cooling reduce maintenance requirements for outdoor installations.
For a 6kW project size, it is a practical choice when the customer wants a reliable grid-tied inverter with monitoring options and no unnecessary storage hardware.
| Parameter | Specification |
| Rated AC Output Active Power | 6 kW |
| Maximum AC Apparent Power | 6.6 kVA |
| Maximum PV Input Power | 7.8 kW |
| Maximum PV Input Voltage | 550 V |
| PV Startup Voltage | 80 V |
| MPPT Operating Voltage Range | 70–500 V |
| Rated PV Input Voltage | 360 V |
| Number of MPPT Trackers | 2 |
| PV String Configuration | 2 / 1+1 |
| Maximum Operating Current | 13+13 A |
| Short‑circuit Current | 19.5+19.5 A |
| Grid Rated Voltage | 220/230 V, L/N/PE |
| Grid Frequency | 50/60 Hz |
| Total Harmonic Current Distortion (THDi) | < 3% |
| Power Factor (PF) | 0.8 leading to 0.8 lagging |
| Peak Efficiency | 97.50% |
| Euro Efficiency | 97.00% |
| MPPT Efficiency | > 99% |
| Ingress Protection | IP65 |
| Surge Protection Device | Type II DC/AC SPD |
| Cooling Method | Natural Cooling |
| Net Weight | 8 kg |
Recommend suitable products and configuration plans based on customers' power demand, application scenarios and budget.

Provide system-level combination suggestions for inverters, energy storage, batteries and supporting products.

All products undergo factory inspection and necessary testing before shipment.

Recommend suitable products and configuration plans based on customers' power demand, application scenarios and budget.

Offer product and system operation training for installers and project parties.
The Jump From One Cabinet to a Site-Wide Storage Plant A single MC-L430-2H3 cabinet delivers 430.08...
READ MORETwo Cabinets, One Battery Chemistry, Very Different Wiring Diagrams Walk up to an MC-L430-2H3 and a...
READ MOREWhy Safety Architecture Decides Whether a C&I Battery Cabinet Survives Ten Years A 430kWh liqui...
READ MORESeven Wiring Diagrams, One Decision Framework The same MS-G215/GS215 cabinet can be wired seven dif...
READ MOREWhy a Battery Cabinet Needs Six Independent Safety Layers, Not One A 215kWh LFP cluster packed into...
READ MORE